DNSP
Defines the relevant project requirements and completes the applicable network process and acceptance.
AmpauraConnect combines network requirements with site conditions to forecast, optimise and schedule. AmpauraGateway applies approved controls locally.
Discuss a network project
The DNSP defines conditions such as dynamic export limits and connection requirements. Ampaura determines how the site operates within those conditions.
Identify the network operating and communication requirements that apply to the project.
Use the CEC-listed CSIP-AUS v1.2 software communication client where the project and DNSP process require it.
Combine the relevant network constraints with site objectives, generation, storage state and operating limits before commissioning.
Confirm the applicable DNSP conditions, DOE or export limits, and the project communication path.
AmpauraConnect combines the applicable constraints with site data and objectives to determine the operating strategy.
Where required, configure the direct project communication interface and approved site operating constraints.
AmpauraGateway applies the controls locally while project testing and acceptance follow the relevant DNSP process.
Defines the relevant project requirements and completes the applicable network process and acceptance.
Commissions the inverter, battery and site equipment required to meet the project design.
Uses AmpauraConnect to optimise within the approved network boundary, then provides Gateway control and project communication within the agreed scope.
AmpauraConnect is CEC listed and integrated with SA Power Networks. Additional DNSP rollouts are in progress, while equipment implementation and project commissioning remain specific to each site.
Discuss a network project


Project enquiry
Tell us what you are designing, connecting or operating. We will use the project context to understand where Ampaura can help.